Some 3000 workers were evacuated from the under-construction Wembley Stadium on Monday after a part of the roof collapsed, BBC News reported.
According to workers, a 50-tonne steel rafter slipped for about three feet down, creating a huge bang but causing no injuries.
Australian construction company Multiplex said in an official statement that the incident didn't affect the structure of the stadium.
"At this point we believe that this is a minor incident," said Multiplex chairman Martin Tidd.
"However as Multiplex has rigorous health and safety guidelines, we have taken the cautious measure of evacuating the site of the 3,000 plus workers until we have a full report on the incident."
This wasn't the first incident in the construction site as a man was killed in 2004 after a collapse of scaffolding.
نرشح لكم
تقرير: ميلان وناديان إنجليزيان يدرسون ضم كيم مين جاي
أوديجارد: ما فعله برناردو سيلفا لا يليق بملعب كرة القدم
مباشر دوري الأمم الأوروبية - بلجيكا (0)-(0) فرنسا.. القائم يمنع الهدف الأول
بيدري: الصداقات أهم من التتويج بالألقاب.. وسنقاتل على جميع البطولات
تشكيل فرنسا - 3 أسماء جديدة تبدأ أمام بلجيكا في دوري الأمم الأوروبية
تشكيل إيطاليا – الشقيقان إسبوزيتو يقودان الهجوم ضد تركيا
من أجل يورو 2032.. الموافقة على استاد روما الجديد
سبورت: برشلونة يدرس ضم ظهيرين أيسر في صفقة انتقال حر












وائل جمعة لـ في الجول: لم نطلب عودة لاعبي الأهلي من معسكر منتخب مصر
تريزيجيه قائد وظهور وحيد.. ماذا حدث في مواجهة منتخب مصر ضد جنوب السودان الوحيدة